Client : K & D Garment
Location : Wadduwa
System Details : 20kW DEYE Inverter & 620W JINKO Solar Panels

Engineered to shield manufacturing operations from rising industrial utility rates and lower corporate carbon footprints, this heavy-duty 20kW solar energy installation was successfully commissioned for K & D Garment in Wadduwa. The infrastructure project was strategically deployed to absorb heavy multi-phase electricity loads—such as machinery, extensive lighting arrays, and ventilation systems—by transitioning the facility's peak daytime production to clean, independent solar power.

The rooftop layout features premium, high-output 620W Jinko Solar Panels. These Tier-1 modules utilize advanced photovoltaic technology to guarantee exceptional daily unit generation ($kWh$) even during the coastal region’s shifting weather patterns or monsoon seasons. Managing this massive power generation is an intelligent, commercial-grade 20kW Deye Inverter. This system ensures high-efficiency solar-to-grid synchronization, robust thermal management under continuous industrial loads, and provides corporate management with real-time digital monitoring to track operational cost reductions.

Key Project Highlights

  • Industrial Overhead Reduction : Specifically designed to target and offset high industrial daytime energy consumption, drastically lowering monthly operational overheads.

  • High-Density Structural Footprint : The deployment of ultra-high-wattage 620W Jinko modules maximized power density on the factory roof, delivering peak target capacity using an optimized, structurally sound footprint.

  • Smart Power Stability : Driven by the versatile Deye inverter platform, ensuring ultra-smooth voltage regulation across factory lines and offering a seamless framework for future industrial battery backup integration.

  • Contact Info
    # 66/A, New Kandy Road,Belummahara
    033 2121810 | 077 4139363
    Follow us
    Instagram

    Copyright © 2026 Silakma.All Rights Reserved.
    Site by AIG Ventures